Honda awarded the joint venture team of Doster-Integral
two contracts at their new assembly and engine plant in Alabama. The
plant will produce the popular Honda Odyssey Minivan. The projects
involve installing pits, trenches, and slabs for Engine Die Cast and
Machining areas of the 163,000 square foot Engine Plant, as well as
installing approximately 118,700 square feet of pits, slabs, and
trenches in the Vehicle Quality Area of the Frame Plant.
|
Honda of Alabama
Engine and Frame Plant
Pits, Slabs, & Trenches Lincoln, Alabama
Client
Honda of America Manufacturing, Inc.
Lincoln, Alabama
Construction Manager
HHG
Construction Cost
$5,277,000
Completion Date
May 2001 |