The joint venture team of Walbridge-Doster was selected
to build this project for Fort Campbell through a proposal process. The
project is a 98,900 square foot Headquarters Building for the 101st
Airborne Division at Fort Campbell. The building is V-shaped consisting
of two floors with a basement and connecting lobby. Being partially
public and partially secure, the building houses administrative offices
and conference rooms. The exterior of the building is consists of brick,
metal wall panels, and a standing seam roof. The entrance is a full
height glass curtain wall system intersected by a poured in place
concrete cylindrical rotunda. |
Fort Campbell Military
Reservation
101st Airborne Division Headquarters
Fort Campbell, Kentucky
Client
U.S. Army Corps of Engineers
Louisville, Kentucky
Architect
The Mason & Hanger Group
Lexington, Kentucky
Construction Cost
$30,000,000
Completion Date
May 2007 |