Field BIM
Status area
To assist the Doster field team with supervision of scopes of work, Doster uses BIM to produce detailed field estimates and drawings. Some examples include detailed 3D Rebar Fabrication models and details, as well as detailed pour drawings including Quantity takeoffs.